Video Transcription

00:00
Hello. Welcome back
00:02
in this lesson. What? This guy's Sistol desire. Like psycho Plan the lying manage.
00:08
I'm your instructor. We
00:11
okay, let's start it.
00:13
The previous video we introduce the enterprise architecture
00:17
In this video, we will talk about a system like psycho
00:21
PBM and a p p t. I o.
00:27
Here is the pre assessment question
00:30
which are the free system network architectures for the enterprise. A hierarchical, be poor lis.
00:38
See distributed the Dennis intern Virtualization E O s. I am Otto Collaboration G Cloud.
00:48
We discussed this previous video.
00:50
The answer should be pornos, disinter, virtualization and cooperation.
00:58
I hope you get this right.
01:00
That's move on.
01:03
Next topic
01:06
Siskel design Lifecycle plan Viewed marriage
01:11
As we know since stories is rolling out and updated a never glad psycho there is divided into three faces
01:19
plan build and manage PBM
01:23
with processes in each face.
01:26
Each stage is in important to meet customer needs. Organizational goes in costumes
01:34
right. This faces are as follows
01:37
plan.
01:38
This face includes the process off assessment on the network strategy
01:46
Networx strategy building a network of design and defy a plan
01:52
build
01:53
These face includes the verification solutions
01:57
deployment
02:00
off new I t. And never Solutions on the MAC creation to new infrastructure
02:06
manage this space. Include the product support solution, support optimization and network operations. Management of processes We're talking about a p p. M. From a previous slight. Now we're talking about a p p d i o
02:23
which is it? Prepare plan the lorry operate
02:27
an optimization
02:30
p p d i o is the historical Cisco Network Life Seco includes the following
02:38
prepare.
02:40
It's ah establish the organization of business requirements develops and networking strategy proposes ah, high level architecture
02:52
and plan. Its identifies the network requirements
02:58
by characterizing and accessing the network as well. I was a programming of Gap analysis.
03:04
The key point into the gap in the House is right.
03:07
I desire Face
03:08
provides high availability reliability, security, scale, ability in a performance.
03:15
That's all your considerations When you put in the design
03:20
right
03:21
employment.
03:23
It's an installation in a configuration of a new agreement
03:28
included a staging
03:31
peel, the
03:34
all things related to the implementation
03:38
Gabby in this space, right
03:42
operate
03:44
in a day to day operations, right?
03:49
Optimized. That's for
03:52
break and fixes. You know, doing the operation any at all on the
03:58
that That's being an optimization face right
04:03
Question Number one match Hppd Io faces with It's a description on the life, the hands I was there all you set six spaces for P p d I O right hand side is your description We need Thio Match them, you know? So
04:21
let's start with a right is a requirement establishment We know this is apartments Assist option It will happen
04:30
Plan face When we do the planning we need to know the requirements
04:34
I be Gabon Alice is Val bia during the preparing face. What preparing face does is it's, you know, requiring the lattices and do the
04:50
and do the Gavin houses
04:53
when you do the proper provide a high availability desire that's obviously happening Design face right for staging the installation in the configuration that the implementation face on the day to day operation That'll be, you know,
05:11
all pretty face
05:12
corrective and management is soft in my station, Right? One
05:17
key part from here is the gap analysis You happen, Lian Wage base. Just remember remember it's happening in
05:26
preparing face
05:28
Know about plants He's okay in the sea. The answer
05:39
I hope you get this right. Okay, let's do the next
05:43
question. Number two. At what stage of the PBM does the never the lying take place
05:48
a desire face
05:51
Be playing face
05:54
See Bill to face the manage face e implementation face off
06:00
meant in a space problem Those bases we know only
06:04
plan viewed
06:06
in marriage
06:09
Those three faces in a you know, including ppm. So
06:15
obviously it's the plan face right
06:18
we go into B
06:21
Hopefully you get the right answer
06:25
in today's brief lecturer with disgust since go desire in life Psycho
06:30
PBM
06:31
p p d i o
06:34
Any questions? Some email
06:40
I was sealing a next video bye for now.

Up Next

CCDA (Cisco Certified Design Associate)

In this CCDA training you will learn the knowledge and skills involved in attaining your Cisco Certified Design Associate (CCDA) certification.

Instructed By

Instructor Profile Image
Wayne Xing
Network Solutions Architect
Instructor